Loram High Performance Shoulder Ballast Cleaner (SBC) as the exclusive method of ballast maintenance. Over 800 km of main line has been cleaned with the SBC with minimal track occupancy (less than 400 hours). 2. RAILWAY BALLAST The railway ballast section is a layer of stones

Nov 14, 2017· Amazing Fastest Homemade Wood Lathe Machines Working Skills Extreme Wood Cutting Machines Easy Duration: 16:01. Machine VT Recommended for you

Shoulder Ballast Cleaner – Specific to SBC34 Warning You cannot undertake this activity in the rail corridor unless you have completed a pre work brief and work site protection plan. Reference should also be made to the Protocol for Entering the ARTC Rail Corridor and the Business Rules for Working in the ARTC Rail Corridor

Deep Screening of Ballast . Deep screening of the ballast is done to ensure that a clean ballast cushion of the required depth is available below the lower half of the sleepers, which is necessary for providing the proper drainage and elasticity to the track.

water to reach the cess or the track drainage, shoulder cleaning restores the drainage path • Not a lot done in the UK (not enough in my opinion) ... • Regular spraying is vital to good track inspection and ballast maintenance. Ballast Regulating • Can be done manually ... without screening • With modern machines very high outputs are

Progress Rail Services'' newest shoulder ballast cleaner is the KSC2000, which features a single shaker screen design capable of cleaning 2,900 tons of ballast per hour.

Strengthening of the railway ballast section shoulder with twocomponent polymeric binders. ... Esmaeili et al. (2017) demonstrated that the test track with steel slag ballast has, on the average, 27% greater lateral resistance than the track with limestone ballast.

TECHNICAL SPECIFICATION FOR SHOULDER BALLAST CLEANING MACHINE GENERAL These specifications are framed for a Shoulder Ballast Cleaning Machine (hereinafter called the machine), which should be capable of removing the ballast from the shoulder portion of the track, screen it, put back the screened ballast and profile it.

Adjustable ballast cleaning screen to allow aggregate size setting from 5/8inch to 1inch for screening material. Distribute returned ballast to either side of the track in tangent or curved track. Regulate/plow returned ballast to fit within standard track crosssection (capable

Dec 22, 2017· Shoulder Ballast Cleaning Machine Working on Phulera to Rewari Railway Track. See the complete working procedure of the machine and learn that how railway works.

SPECIAL SPECIFICATION 4391 Ballasted Track Construction 1. Description. This Item shall govern for the construction of ballasted track on constructed trackbed. Ballasted track construction includes, but is not limited to, placing ballast, distributing and lining ties, installing and field welding running rail, raising and lining track,

the life cycle of ballast. A laboratory test procedure was developed to quantify the degradation ... degradation compared with 41% of the fouling material on the British Railway system being from ballast degradation (2). The portion of ballast degradation due to tamping has been studied previously with wide

A Loram shoulder ballast cleaning program ensures a healthy, robust railroad infrastructure maintained to deliver maximum ROI. Shoulder ballast cleaning consists of removing ballast at the end of the ties, separating and discarding fines and fouled ballast from reusable ballast and restoring the reusable ballast to the shoulder.

1 The contribution of base, crib and shoulder ballast to the lateral sliding resistance of railway track; a geotechnical perspective Authors: Le Pen and Powrie

This powder along with dust, sand ashes from locomotive form an impervious layer and prevent the ease flow of water through ballast. The ballast are constantly press in the formation. This reduces the quantity of the ballast and also the elasticity of the railway track is affected. The ballast is cleaned regularly by means of screening.

Furthermore, track ballast that is completely fouled can not be corrected by shoulder cleaning. In such cases, it is necessary to replace the ballast altogether. One method of "replacing" ballast, if necessity demands, is to simply dump fresh ballast on the track, jack the whole track .

This is because as the ballast layer tends to deform, the grains are restrained by tension generated within the fibres. However, the biggest benefit in the tests carried out in the SRTF was obtained by reducing the slope at the edge of the mound of ballast on which the track sits (termed the "ballast shoulder").

As such, an investigation was carried out on track lateral resistance based on a realistic DEM simulation of STPT and a comprehensive sensitivity analysis on geometrical and mechanical properties of ballast layer. A test track in the Aprin railway station in the vicinity of Tehran city was prepared and several field STPTs were performed.

Nov 06, 2007· On modern welded track with heavier flatbottom rail, I understand that the depth of ballast is greater to help hold the track more firmly. Also the concrete sleepers are greater in depth? And on a curve the superelevation on the outside of a bend also creates a deeper layer of ballast. The shoulder is normally a 45 degree (1 in 1) slope.

shoulder cleaning process was highly effective in removing fines and restoring desirable shoulder ballast support and drainage properties. Further periodic analysis also supports that the fines in the center of the track and along the shoulders tend to move outward and downward during the test with the percentage of fines in the cleaned ...

ballast shoulder cleaning operations, and periodically over time after shoulder cleaning. Eight sets of samples were collected over a period of 2 years. Sieve analysis immediately before and after ballast shoulder cleaning shows that the ballast shoulder cleaning process was effective in removing fines and restoring desirable drainage properties.

Similar to the laboratory studies, a 40 cmwide ballast shoulder was implemented in the test track. The geogrid used in these tests was 4 m wide, and it was spread out along the required lengths as mentioned previously. Fig. 8 demonstrates the different parts of the test track along with the location of geogrids.

depth≥850mm(under railway surface) Screening efficiency: The cleaned ballast returned to the shoulders shall not exceed 3% fines when operating at the rated capacity of 1200m 3 /h with initial ballast bed contamination less than 30% fines. And the usable ballast contained in the waste shall not exceed 5% in weight.

adequate lateral track stability with smaller ballast shoulder widths than those specified in Table [8] The resistance to buckling forces may be enhanced by the provision of a ballast shoulder surcharge (windrow). [9] Use of the guidelines in this Clause will provide a design ballast shoulder .